Well we have not done bad.
27th June to 8th August, with just the Turbine installed.
Got to the site, this morning and the low voltage trip had shut things down.
I've left the repeater off, to give the batteries a chance to recharge fully.
Although there was not much wind at the site, with the turbine just gently turning, on occasion.
I'll go back to the site, tomorrow, and take a look see.
I'll update you all again, tomorrow. But I will switch JB back on again if the batteries are OK.
Cheers & 73's
Dave, G3ZXX.
P.S. Once we can get the Tower to the site and installed, we'll be able to install the Solar Panel, into a secure position - up the top of the tower.